|
|
 |
 |
 |
 |
|
OSHA
[ Tutorial ]
[ Hot Topics ]
[ Case Studies ]
[ LOTO standard ]
[ LOTO preamble ]
[ Compliance directive ]
[ Selected case law ]
[ Selected letters of interpretation ]
- January 5, 1998: Definition of
energy isolating device (1910.147(b)); interpretation of energy isolation device
requirements under energy control program (c)(1).
- June 23, 1997: Energy control
procedures (c)(4)(i); periodic inspection (c)(6)(i).
- October 30, 1996: Impact of GM,
6th circuit court decision, on the enforcement of control of hazardous energy
requirements, Scope
(a)(1)(i).
- October 29, 1996: Performing
periodic inspections by an authorized employee (c)(6)(i)(A).
- October 2, 1996: Group
lockout/tagout (f)(3).
- June 20, 1996: Energy control
procedures (c)(4); training (c)(7)(i)(A); retraining (c)(7)(ii)(A); certification of
training (c)(7)(iv); periodic inspections (c)(6)(i); normal production operations
(a)(2)(ii), Exception; outside Personnel (f)(2).
- May 28, 1996: Scope
(a)(1)(i).
- October 19, 1995: Periodic
inspection (c)(6);energy control procedures (c)(4).
- September 19, 1995:
Periodic inspection (c)(6); annual inspection of the energy control procedure (c)(6)(i).
- May 24, 1995: Clarification
of the Electric Power Generation standard 1910.269; tagout devices and their means of
attachment
.147(c)(5)(ii)(C)(2) & .269(d)(3)(ii)(D); requirements for lockout and
tagout devices (c)(5)(ii)(D) & .269(d)(3)(ii)(E).
- August 12, 1994: Energy
control procedure (c)(4); work on cord and plug (a)(2)(iii)(A); normal production operation
(a)(2)(ii) Exception; when service and maintenance work is covered during normal
production (c)(4); specific procedures required for the control of hazardous energy
(c)(4)(ii);electrical safety-related work practices 1910.333(b)(2).
- August 5, 1994: Periodic
inspection by an authorized employee
(c)(6)(i)(A).
- March 3, 1994: Clarification
of relationship between 1910.147 and permit space isolation required by 1910.146.
- June 30, 1993: Definition
of what "under the exclusive control of the employee"means with respect to cord
and plug connected electric equipment (a)(2)(iii)(A).
- June 14, 1993:
Applicability of the Machine Guarding and Lockout/Tagout standards to Printing Presses
(1910.147; 1910.212; 1910.219); normal production operations
(a)(2)(ii), Exception.
- December 23, 1992: Installations
under the exclusive control of electric utilities (a)(1)(ii)(B); outside personnel (f)(2).
- January 7, 1992: Electrical
safety related work practices standards (1910.331-339) and its relationship to lockout/
tagout; energy control program (c)(1).
- September 4, 1991: Lockout
or tagout devices removal (e)(3).
- August 5, 1991: Relationship
of motor starter circuits and energy isolation devices (1910.399,
1910.305, 1910.147); definition of energy isolating device (b).
- July 29, 1991: Lockout/tagout
requirements with regard to cleanup and sanitizing of machinery and equipment in the
meatpacking industry
(a)(1)(i), (a)(2)(i-ii); normal production operations
(a)(2)(ii), Exception..
- April 10, 1991: Documentation
of energy control procedures (c)(4).
- January 1, 1991: Group
lockout tagout (f)(3); Interface of the Electrical Safety Related-Work Practices standard
to Lockout/tagout (1910.333(b)(2)).
- October 15, 1990:
Lockout/tagout of electrical equipment under Electrical Safety Related-Work
Practices standard (1910.333); scope of lockout/tagout standard (a)(2)(ii)(C).
- May 1, 1990: Normal
production operations (a)(2)(ii), Exception.
|
|
 |
 |
 |
 |
|